Avery Arthur's Race Results

Below you'll find a detailed table of race results. The "Performance Score" reflects the rating for that specific race, while the "Updated Rating" represents your cumulative rating, influenced by past performances. This distinction is key, as your overall rating is a weighted average that slowly responds to your most recent race's performance score. For a visual representation of how these ratings evolve, refer to the graph below.

Event Date Event Name Race Name Finishing Place Finishing Time Performance Score Updated Rating
2023-08-28 55th Kirk Schmaltz XC Invite 55th Kirk Schmaltz XC Invite 9-10 Boys 33 20:06.29 1713 1709
2023-09-07 50th Bobcat XC Invitational 50th Bobcat XC Invitational 9-10 Boys 58 19:20.90 1784 1755
2023-09-16 Heartland XC Classic Mens 5,000 Meters Frosh/Soph 21 19:07.29 1854 1810
2023-09-28 Southeast Polk XC meet Southeast Polk CC Invitational 2 - JV Boys 53 19:37.29 1820 1816
2023-10-05 Fort Dodge Invite Mens 5,000 Meters Junior Varsity 118 19:03.40 1814 1815
2023-10-11 CIML Conference Mens 5,000 Meters Frosh/Soph 22 18:22 1876 1843
2024-09-05 2024 Ames - Schmaltz XC Invite Ames - Kirk Schmaltz Invitational 9-10 Boys 11 17:47.20 2018 2013
2024-09-12 51st Marshalltown Bobcat xc Invite 51st Marshalltown Bobcat xc Invite 9-10 boys 22 17:34.29 2041 2029
2024-09-21 19th Heartland Classic 19th Heartland Classic 9-10-JV boys 16 18:02 2102 2067
2024-09-27 Rim Rock Farm Classic Boys Gold JV 5k 8 17:58.90 2081 2074
2024-10-03 Southeast Polk CC Invitational Southeast Polk CC Invitational JV boys 20 18:33.29 2039 2058
2024-10-10 Ft Dodge Cross Country Invite Fort Dodge Cross Country Invite JV boys 25 18:08.70 2036 2047
2024-10-15 CIML Conference XC CIML Conference Cross Country Boys 9/10 5 km 5 17:28.40 2179 2098

Performance Trends Over Time

Explore the visual trends of performance scores and updated ratings across different events. This graphical representation helps in understanding the progression and fluctuations in performance over time.

Ratings are dynamic estimates, representing a range of potential future performance outcomes. The box plots above illustrate these ranges, with the red dotted line indicating the "Performance Score" and the solid blue line showing the "Updated Rating". A performance score falling outside the expected range can lead to significant adjustments in the updated rating, reflecting the dynamic nature of performance evaluation.