Reid Christensen's Race Results

Below you'll find a detailed table of race results. The "Performance Score" reflects the rating for that specific race, while the "Updated Rating" represents your cumulative rating, influenced by past performances. This distinction is key, as your overall rating is a weighted average that slowly responds to your most recent race's performance score. For a visual representation of how these ratings evolve, refer to the graph below.

Event Date Event Name Race Name Finishing Place Finishing Time Performance Score Updated Rating
2023-08-28 55th Kirk Schmaltz XC Invite 55th Kirk Schmaltz XC Invite 9-10 Boys 77 21:33 1436 1437
2023-09-07 50th Bobcat XC Invitational 50th Bobcat XC Invitational 9-10 Boys 157 21:08.59 1437 1437
2023-09-12 49th Tom Karpan XC Invite 49th Tom Karpan XC Invite JV boys 44 21:34.40 1477 1456
2023-09-16 Heartland XC Classic Mens 5,000 Meters Junior Varsity 129 20:30.09 1543 1490
2023-09-21 Indianola CC Invitational 55th Indianola XC Invitational 2 - 9-10-JV Boys 56 20:28.20 1561 1524
2023-09-28 Southeast Polk XC meet Southeast Polk CC Invitational 2 - JV Boys 122 21:09 1500 1511
2023-10-05 Fort Dodge Invite Mens 5,000 Meters Junior Varsity 183 19:37.09 1577 1543
2023-10-11 CIML Conference Mens 5,000 Meters Frosh/Soph 58 19:20.09 1454 1604
2024-09-05 2024 Ames - Schmaltz XC Invite Ames - Kirk Schmaltz Invitational 9-10 Boys 29 18:48.90 1705 1701
2024-09-12 51st Marshalltown Bobcat xc Invite 51st Marshalltown Bobcat xc Invite 9-10 boys 74 18:39.79 1694 1697
2024-09-17 50th Tom Karpen XC Invite 50th Tom Karpen XC Invite JV boys 10 19:43.59 1748 1720
2024-09-26 56th Indianola CC Invitational 56th Indianola CC Invitational 9-10-JV boys 13 17:51.20 1777 1749
2024-10-10 Ft Dodge Cross Country Invite Fort Dodge Cross Country Invite JV boys 139 19:26.40 1647 1686
2024-10-15 CIML Conference XC CIML Conference Cross Country Boys 9/10 5 km 102 20:39.70 1454 1604

Performance Trends Over Time

Explore the visual trends of performance scores and updated ratings across different events. This graphical representation helps in understanding the progression and fluctuations in performance over time.

Ratings are dynamic estimates, representing a range of potential future performance outcomes. The box plots above illustrate these ranges, with the red dotted line indicating the "Performance Score" and the solid blue line showing the "Updated Rating". A performance score falling outside the expected range can lead to significant adjustments in the updated rating, reflecting the dynamic nature of performance evaluation.