Jack Atwood's Race Results

Below you'll find a detailed table of race results. The "Performance Score" reflects the rating for that specific race, while the "Updated Rating" represents your cumulative rating, influenced by past performances. This distinction is key, as your overall rating is a weighted average that slowly responds to your most recent race's performance score. For a visual representation of how these ratings evolve, refer to the graph below.

Event Date Event Name Race Name Finishing Place Finishing Time Performance Score Updated Rating
2023-08-28 55th Kirk Schmaltz XC Invite 55th Kirk Schmaltz XC Invite 9-10 Boys 161 26:37.29 1038 1045
2023-09-07 50th Bobcat XC Invitational 50th Bobcat XC Invitational 9-10 Boys 347 27:28.90 892 946
2023-09-16 Heartland XC Classic Mens 5,000 Meters Frosh/Soph 146 25:36.40 1010 993
2023-09-28 Southeast Polk XC meet Southeast Polk CC Invitational 2 - JV Boys 296 26:31.29 988 990
2023-10-05 Fort Dodge Invite Mens 5,000 Meters Junior Varsity 538 24:19.5 1040 1016
2023-10-11 CIML Conference Mens 5,000 Meters Frosh/Soph 169 22:49.29 1202 1130
2024-09-05 2024 Ames - Schmaltz XC Invite Ames - Kirk Schmaltz Invitational 9-10 Boys 155 22:58.5 1158 1155
2024-09-12 51st Marshalltown Bobcat xc Invite 51st Marshalltown Bobcat xc Invite 9-10 boys 332 23:38.09 1085 1113
2024-09-21 19th Heartland Classic 19th Heartland Classic 9-10-JV boys 335 25:48.09 955 1027
2024-10-03 Southeast Polk CC Invitational Southeast Polk CC Invitational JV boys 263 24:17.90 1141 1110
2024-10-10 Ft Dodge Cross Country Invite Fort Dodge Cross Country Invite JV boys 558 24:51.29 985 1028
2024-10-15 CIML Conference XC CIML Conference Cross Country Boys 9/10 5 km 164 22:33.59 1202 1130

Performance Trends Over Time

Explore the visual trends of performance scores and updated ratings across different events. This graphical representation helps in understanding the progression and fluctuations in performance over time.

Ratings are dynamic estimates, representing a range of potential future performance outcomes. The box plots above illustrate these ranges, with the red dotted line indicating the "Performance Score" and the solid blue line showing the "Updated Rating". A performance score falling outside the expected range can lead to significant adjustments in the updated rating, reflecting the dynamic nature of performance evaluation.