Avery Elston's Race Results

Below you'll find a detailed table of race results. The "Performance Score" reflects the rating for that specific race, while the "Updated Rating" represents your cumulative rating, influenced by past performances. This distinction is key, as your overall rating is a weighted average that slowly responds to your most recent race's performance score. For a visual representation of how these ratings evolve, refer to the graph below.

Event Date Event Name Race Name Finishing Place Finishing Time Performance Score Updated Rating
2023-08-28 55th Kirk Schmaltz XC Invite 55th Kirk Schmaltz XC Invite 9-10 Girls 47 26:06 1308 1311
2023-09-07 50th Bobcat XC Invitational 50th Bobcat XC Invitational 9-10 Girls 71 25:02.59 1304 1307
2023-09-12 49th Tom Karpan XC Invite 49th Tom Karpan XC Invite JV girls 141 30:25.20 998 1229
2023-09-28 Southeast Polk XC meet Southeast Polk CC Invitational 1 - JV Girls 71 24:45.90 1367 1329
2023-10-05 Fort Dodge Invite Womens 5,000 Meters Junior Varsity 103 23:13.70 1380 1358
2023-10-11 CIML Conference Womens 5,000 Meters Frosh/Soph 33 22:38.5 1403 1380
2024-09-05 2024 Ames - Schmaltz XC Invite Ames - Kirk Schmaltz Invitational 9-10 Girls 49 24:03 1323 1325
2024-09-12 51st Marshalltown Bobcat xc Invite 51st Marshalltown Bobcat xc Invite 9-10 girls 96 25:06.40 1234 1271
2024-09-21 19th Heartland Classic 19th Heartland Classic 9-10-JV girls 113 25:29.5 1266 1268
2024-10-03 Southeast Polk CC Invitational Southeast Polk CC Invitational JV girls 121 26:26 1219 1240
2024-10-10 Ft Dodge Cross Country Invite Fort Dodge Cross Country Invite JV girls 155 24:36.79 1281 1261
2024-10-15 CIML Conference XC CIML Conference Cross Country Girls 9/10 5 km 63 24:05.70 1303 1281

Performance Trends Over Time

Explore the visual trends of performance scores and updated ratings across different events. This graphical representation helps in understanding the progression and fluctuations in performance over time.

Ratings are dynamic estimates, representing a range of potential future performance outcomes. The box plots above illustrate these ranges, with the red dotted line indicating the "Performance Score" and the solid blue line showing the "Updated Rating". A performance score falling outside the expected range can lead to significant adjustments in the updated rating, reflecting the dynamic nature of performance evaluation.