Olivia Smith's Race Results

Below you'll find a detailed table of race results. The "Performance Score" reflects the rating for that specific race, while the "Updated Rating" represents your cumulative rating, influenced by past performances. This distinction is key, as your overall rating is a weighted average that slowly responds to your most recent race's performance score. For a visual representation of how these ratings evolve, refer to the graph below.

Event Date Event Name Race Name Finishing Place Finishing Time Performance Score Updated Rating
2023-08-28 55th Kirk Schmaltz XC Invite 55th Kirk Schmaltz XC Invite 9-10 Girls 59 27:24.09 1216 1221
2023-09-07 50th Bobcat XC Invitational 50th Bobcat XC Invitational 9-10 Girls 79 25:18.29 1288 1263
2023-09-16 Heartland XC Classic Womens 5,000 Meters Junior Varsity 105 25:30 1269 1267
2023-09-28 Southeast Polk XC meet Southeast Polk CC Invitational 1 - JV Girls 135 26:30.59 1235 1249
2023-10-05 Fort Dodge Invite Womens 5,000 Meters Junior Varsity 190 24:34.20 1220 1234
2023-10-11 CIML Conference Womens 5,000 Meters Frosh/Soph 68 24:23.5 1234 1234
2024-09-05 2024 Ames - Schmaltz XC Invite Ames - Kirk Schmaltz Invitational 9-10 Girls 46 23:54.09 1330 1327
2024-09-12 51st Marshalltown Bobcat xc Invite 51st Marshalltown Bobcat xc Invite 9-10 girls 56 23:09.70 1381 1358
2024-09-17 50th Tom Karpen XC Invite 50th Tom Karpen XC Invite 3 - JV girls 32 25:27.20 1382 1370
2024-10-10 Ft Dodge Cross Country Invite Fort Dodge Cross Country Invite JV girls 136 24:16 1310 1330

Performance Trends Over Time

Explore the visual trends of performance scores and updated ratings across different events. This graphical representation helps in understanding the progression and fluctuations in performance over time.

Ratings are dynamic estimates, representing a range of potential future performance outcomes. The box plots above illustrate these ranges, with the red dotted line indicating the "Performance Score" and the solid blue line showing the "Updated Rating". A performance score falling outside the expected range can lead to significant adjustments in the updated rating, reflecting the dynamic nature of performance evaluation.