Alex Argotsinger's Race Results

Below you'll find a detailed table of race results. The "Performance Score" reflects the rating for that specific race, while the "Updated Rating" represents your cumulative rating, influenced by past performances. This distinction is key, as your overall rating is a weighted average that slowly responds to your most recent race's performance score. For a visual representation of how these ratings evolve, refer to the graph below.

Event Date Event Name Race Name Finishing Place Finishing Time Performance Score Updated Rating
2023-08-26 Johnston xc Invite Johnston XC Invite Boys 82 20:43.40 1485 1485
2023-09-02 Urbandale Invitational Urbandale Invitational Cross Country Boys 5 km 59 21:03.29 1552 1525
2023-09-07 50th Bobcat XC Invitational 50th Bobcat XC Invitational 9-10 Boys 113 20:28.90 1518 1521
2023-09-30 Steve Johnson Invitational Mens 5,000 Meters Boys JV 5000M 76 20:25.20 1609 1581
2023-10-05 Fort Dodge Invite Mens 5,000 Meters Junior Varsity 138 19:15.20 1630 1607
2023-10-11 CIML Conference Mens 5,000 Meters Frosh/Soph 68 19:36.09 1601 1550
2024-09-07 2024 Urbandale Invitational XC Urbandale Invitational Cross Country Boys 5 km 88 21:16.09 1426 1430
2024-09-12 51st Marshalltown Bobcat xc Invite 51st Marshalltown Bobcat xc Invite JV boys 130 19:39.70 1562 1512
2024-09-19 39th Rich Engel Classic CC 39th Rich Engel Classic CC JV boys 228 23:03.5 1340 1408
2024-09-26 Eastern Iowa Classic JV Boys 200 21:31.20 1303 1346
2024-10-10 Ft Dodge Cross Country Invite Fort Dodge Cross Country Invite JV boys 213 20:12.79 1539 1490
2024-10-15 CIML Conference XC CIML Conference Cross Country Boys JV 5 km 69 19:43.5 1601 1550

Performance Trends Over Time

Explore the visual trends of performance scores and updated ratings across different events. This graphical representation helps in understanding the progression and fluctuations in performance over time.

Ratings are dynamic estimates, representing a range of potential future performance outcomes. The box plots above illustrate these ranges, with the red dotted line indicating the "Performance Score" and the solid blue line showing the "Updated Rating". A performance score falling outside the expected range can lead to significant adjustments in the updated rating, reflecting the dynamic nature of performance evaluation.