Zoe Hinze's Race Results

Below you'll find a detailed table of race results. The "Performance Score" reflects the rating for that specific race, while the "Updated Rating" represents your cumulative rating, influenced by past performances. This distinction is key, as your overall rating is a weighted average that slowly responds to your most recent race's performance score. For a visual representation of how these ratings evolve, refer to the graph below.

Event Date Event Name Race Name Finishing Place Finishing Time Performance Score Updated Rating
2023-08-26 Johnston xc Invite Johnston XC Invite Girls 58 23:21.40 1599 1597
2023-09-02 Abraham Lincoln Lynx CC Invitational Womens 5,000 Meters Varsity 29 25:57.29 1604 1601
2023-09-07 50th Bobcat XC Invitational 50th Bobcat XC Invitational JV Girls 104 25:32.90 1453 1541
2023-09-28 Southeast Polk XC meet Southeast Polk CC Invitational 1 - JV Girls 69 24:40.59 1583 1574
2023-10-05 Fort Dodge Invite Womens 5,000 Meters Junior Varsity 148 23:56.90 1506 1534
2023-10-11 CIML Conference Womens 5,000 Meters Junior Varsity 15 22:15.79 1645 1688
2024-08-31 Dragon Sunrise XC Invite Dragon Sunrise XC Invitational 34 23:03.59 1796 1791
2024-09-07 55th Annual Abraham Lincoln HS CC Invite Girls 5k 17 23:35.21 1831 1814
2024-09-12 51st Marshalltown Bobcat xc Invite 51st Marshalltown Bobcat xc Invite JV girls 21 21:49 1818 1816
2024-09-17 50th Tom Karpen XC Invite 50th Tom Karpen XC Invite 3 - JV girls 16 24:02.79 1771 1797
2024-10-03 Southeast Polk CC Invitational Southeast Polk CC Invitational JV girls 35 23:41.09 1774 1783
2024-10-10 Ft Dodge Cross Country Invite Fort Dodge Cross Country Invite JV girls 77 23:23.59 1680 1734
2024-10-15 CIML Conference XC CIML Conference Cross Country Girls JV 5 km 36 23:31.79 1645 1688

Performance Trends Over Time

Explore the visual trends of performance scores and updated ratings across different events. This graphical representation helps in understanding the progression and fluctuations in performance over time.

Ratings are dynamic estimates, representing a range of potential future performance outcomes. The box plots above illustrate these ranges, with the red dotted line indicating the "Performance Score" and the solid blue line showing the "Updated Rating". A performance score falling outside the expected range can lead to significant adjustments in the updated rating, reflecting the dynamic nature of performance evaluation.