Felix Miguez's Race Results

Below you'll find a detailed table of race results. The "Performance Score" reflects the rating for that specific race, while the "Updated Rating" represents your cumulative rating, influenced by past performances. This distinction is key, as your overall rating is a weighted average that slowly responds to your most recent race's performance score. For a visual representation of how these ratings evolve, refer to the graph below.

Event Date Event Name Race Name Finishing Place Finishing Time Performance Score Updated Rating
2023-08-28 55th Kirk Schmaltz XC Invite 55th Kirk Schmaltz XC Invite 9-10 Boys 58 21:03.70 1633 1631
2023-09-07 50th Bobcat XC Invitational 50th Bobcat XC Invitational 9-10 Boys 152 21:03.5 1605 1615
2023-09-14 Clear Lake Invitational Mens 5,000 Meters Junior Varsity 28 20:19.70 2036 1954
2023-09-21 Indianola CC Invitational 55th Indianola XC Invitational 2 - 9-10-JV Boys 94 21:39 1604 1629
2023-09-28 Southeast Polk XC meet Southeast Polk CC Invitational 2 - JV Boys 113 20:50.29 1680 1657
2023-10-05 Fort Dodge Invite Mens 5,000 Meters Junior Varsity 245 20:05.5 1675 1666
2023-10-12 Iowa Alliance Conference 2023 JV Boys 5000 Meter Run Finals 26 19:45.5 1700 1682
2024-09-05 2024 Ames - Schmaltz XC Invite Ames - Kirk Schmaltz Invitational 9-10 Boys 27 18:43.20 1898 1893
2024-09-12 51st Marshalltown Bobcat xc Invite 51st Marshalltown Bobcat xc Invite 9-10 boys 70 18:38.70 1877 1884
2024-09-19 Clear Lake Invitational Boys JV 5000M 1 19:08.29 2036 1954

Performance Trends Over Time

Explore the visual trends of performance scores and updated ratings across different events. This graphical representation helps in understanding the progression and fluctuations in performance over time.

Ratings are dynamic estimates, representing a range of potential future performance outcomes. The box plots above illustrate these ranges, with the red dotted line indicating the "Performance Score" and the solid blue line showing the "Updated Rating". A performance score falling outside the expected range can lead to significant adjustments in the updated rating, reflecting the dynamic nature of performance evaluation.