Joseph Payton's Race Results

Below you'll find a detailed table of race results. The "Performance Score" reflects the rating for that specific race, while the "Updated Rating" represents your cumulative rating, influenced by past performances. This distinction is key, as your overall rating is a weighted average that slowly responds to your most recent race's performance score. For a visual representation of how these ratings evolve, refer to the graph below.

Event Date Event Name Race Name Finishing Place Finishing Time Performance Score Updated Rating
2023-08-28 55th Kirk Schmaltz XC Invite 55th Kirk Schmaltz XC Invite Varsity Boys 70 18:02.5 1918 1911
2023-09-07 50th Bobcat XC Invitational 50th Bobcat XC Invitational Varsity Boys 131 19:36 1762 1804
2023-09-14 Clear Lake Invitational Mens 5,000 Meters Varsity 16 18:06 2175 2124
2023-09-21 Indianola CC Invitational 55th Indianola XC Invitational 4 - Varsity Boys 68 19:40.5 1826 1855
2023-09-28 Southeast Polk XC meet Southeast Polk CC Invitational 4 - Varsity Boys 36 19:10 1867 1863
2023-10-05 Fort Dodge Invite Mens 5,000 Meters Varsity 178 18:30.90 1892 1878
2023-10-12 Iowa Alliance Conference 2023 JV Boys 5000 Meter Run Finals 7 18:39.90 1850 1864
2024-09-05 2024 Ames - Schmaltz XC Invite Ames - Kirk Schmaltz Invitational Varsity Boys 69 17:44.79 2024 2020
2024-09-12 51st Marshalltown Bobcat xc Invite 51st Marshalltown Bobcat xc Invite JV boys 14 17:18.40 2100 2067
2024-09-19 Clear Lake Invitational Boys Varsity 5000M 10 18:21.40 2175 2124

Performance Trends Over Time

Explore the visual trends of performance scores and updated ratings across different events. This graphical representation helps in understanding the progression and fluctuations in performance over time.

Ratings are dynamic estimates, representing a range of potential future performance outcomes. The box plots above illustrate these ranges, with the red dotted line indicating the "Performance Score" and the solid blue line showing the "Updated Rating". A performance score falling outside the expected range can lead to significant adjustments in the updated rating, reflecting the dynamic nature of performance evaluation.