Patrick Lee's Race Results

Below you'll find a detailed table of race results. The "Performance Score" reflects the rating for that specific race, while the "Updated Rating" represents your cumulative rating, influenced by past performances. This distinction is key, as your overall rating is a weighted average that slowly responds to your most recent race's performance score. For a visual representation of how these ratings evolve, refer to the graph below.

Event Date Event Name Race Name Finishing Place Finishing Time Performance Score Updated Rating
2023-09-02 Pella Dutch XC Invite Pella Dutch XC Invite Boys 151 21:45.20 1442 1443
2023-09-07 GILBERT CC INVITATIONAL Boys 5k Run CC JUNIOR VARSITY 33 19:47.90 1599 1540
2023-09-11 43rd Mike Carr Invitational 43rd Mike Carr Invitational XC Meet JV Boys 90 20:48.90 1561 1553
2023-09-15 Tiger Invitational XC Tiger Invit Backup JV Boys 5 km 29 21:10.20 1476 1514
2023-09-28 Perry CC Invite Boys 5k Run Junior Varsity 17 19:46.20 1574 1553
2023-10-05 Fort Dodge Invite Mens 5,000 Meters Junior Varsity 233 20:00.79 1519 1534
2023-10-10 2023 Raccoon River Conference XC Raccoon River Conference XC JV Boys 5 km 60 20:14.70 1476 1507
2024-08-31 Dragon Sunrise XC Invite Dragon Sunrise XC Invitational - Boys 116 20:22.40 1530 1529
2024-09-07 2024 Pella HS XC Invite Pella - Dutch XC Invitational Boys 84 19:48.90 1595 1568
2024-09-12 Gilbert CC Invite Boys 5k Junior Varsity 66 20:22.09 1480 1524
2024-09-24 48th Steve McDermott Cardinal CC Invite 48th Steve McDermott Cardinal CC Invite JV boys 45 21:08.29 1457 1484
2024-10-10 Ft Dodge Cross Country Invite Fort Dodge Cross Country Invite JV boys 250 20:36.70 1484 1484
2024-10-15 RRC Conference Meet at Winterset Boys 5k JUNIOR VARSITY 33 20:17 1532 1507

Performance Trends Over Time

Explore the visual trends of performance scores and updated ratings across different events. This graphical representation helps in understanding the progression and fluctuations in performance over time.

Ratings are dynamic estimates, representing a range of potential future performance outcomes. The box plots above illustrate these ranges, with the red dotted line indicating the "Performance Score" and the solid blue line showing the "Updated Rating". A performance score falling outside the expected range can lead to significant adjustments in the updated rating, reflecting the dynamic nature of performance evaluation.