Bradey Haberl's Race Results

Below you'll find a detailed table of race results. The "Performance Score" reflects the rating for that specific race, while the "Updated Rating" represents your cumulative rating, influenced by past performances. This distinction is key, as your overall rating is a weighted average that slowly responds to your most recent race's performance score. For a visual representation of how these ratings evolve, refer to the graph below.

Event Date Event Name Race Name Finishing Place Finishing Time Performance Score Updated Rating
2023-08-28 Webster City Lynx CC Invite Boys 5000 Meter Run PURPLE DIVISION 53 24:22.97 1355 1357
2023-09-05 Belmond-Klemme Invitational Mens 5,000 Meters Varsity 81 23:23.05 1401 1383
2023-09-11 43rd Mike Carr Invitational 43rd Mike Carr Invitational XC Meet JV Boys 189 22:48.09 1312 1348
2023-09-21 Roland Story CC Invite Boys 5k Run Junior Varsity 45 22:27.36 1250 1271
2023-09-25 Nevada XC Invitational Mens 5,000 Meters JV Boys 51 23:06.5 1306 1324
2023-09-28 Perry CC Invite Boys 5k Run Junior Varsity 48 21:26.5 1330 1304
2023-10-05 South Hamilton Invitational Mens 5,000 Meters Varsity 61 21:37 1369 1356
2023-10-09 HOIAC Conference CC Meet Boys 5k Run High School 60 21:45.54 1345 1351
2024-09-03 2024 Webster City Invite Boys 5k Gold Division VARSITY 49 23:35.5 1289 1292
2024-09-10 R.S Belmond-Klemme Invitational Boys 5000M 80 22:25.79 1419 1371
2024-09-16 44th Mike Carr CC Invite 44th Mike Carr CC Invite JV boys 118 23:23.90 1260 1301
2024-09-26 Roland Story CC Invite Boys 5k VARSITY 79 22:07.01 1250 1271
2024-09-30 Nevada Cubs JV Boys 37 23:08.40 1303 1286
2024-10-03 Perry CC Invite Boys 5k HIGH SCHOOL 82 22:42.70 1330 1304
2024-10-10 South Hamilton CC Invite Boys 5k HIGH SCHOOL 50 22:03.29 1333 1318

Performance Trends Over Time

Explore the visual trends of performance scores and updated ratings across different events. This graphical representation helps in understanding the progression and fluctuations in performance over time.

Ratings are dynamic estimates, representing a range of potential future performance outcomes. The box plots above illustrate these ranges, with the red dotted line indicating the "Performance Score" and the solid blue line showing the "Updated Rating". A performance score falling outside the expected range can lead to significant adjustments in the updated rating, reflecting the dynamic nature of performance evaluation.