Bodie Logsdon's Race Results

Below you'll find a detailed table of race results. The "Performance Score" reflects the rating for that specific race, while the "Updated Rating" represents your cumulative rating, influenced by past performances. This distinction is key, as your overall rating is a weighted average that slowly responds to your most recent race's performance score. For a visual representation of how these ratings evolve, refer to the graph below.

Event Date Event Name Race Name Finishing Place Finishing Time Performance Score Updated Rating
2023-08-29 Clinton Schoolhouse Open 2023 Varsity Boys 5000 Meter Run Finals 54 22:28.29 1591 1589
2023-09-02 Pleasant Valley Spartan Classic Mens 5,000 Meters Junior Varsity 97 23:25 1465 1517
2023-09-07 Cedar Rapids Invitational Mens 5,000 Meters Junior Varsity 65 20:47.50 1551 1506
2023-09-21 Jim Boughton XC Mens 5,000 Meters JV Boys 93 21:10.90 1436 1465
2023-09-28 Davenport City Meet 2023 Freshman/Sophomore Boys 5000 Meter Run Finals 12 21:20.5 1575 1558
2023-10-05 Jim Hetrick Invitational (Central DeWitt) Mens 5,000 Meters Boys Junior Varsity 5K 39 21:42 1518 1499
2023-10-12 2023 MAC XC Conference Championships JV Boys 63 21:57.90 1477 1510
2024-08-28 2024 Davenport City Meet JV Boys 10 26:14.29 1427 1430
2024-09-03 2024 Clinton Schoolhouse Open JV Boys 32 22:34.29 1544 1499
2024-09-07 2024 Spartan Challenge Junior Varsity Male 116 23:16 1423 1454
2024-09-12 Cedar Rapids Invitational JV Boys 5K 90 21:43.59 1551 1506
2024-09-17 North Scott Lancer XC JV Boys 50 23:00.5 1494 1500
2024-09-26 Jim Boughton XC JV Boys 91 22:30.79 1436 1465
2024-10-10 Jim Hetrick Invitational (Central DeWitt) Boys Junior Varsity 5K 40 21:43.5 1518 1499
2024-10-16 Mississippi Athletic Conference Meet Boys Junior Varsity 5K 61 21:08.20 1551 1526

Performance Trends Over Time

Explore the visual trends of performance scores and updated ratings across different events. This graphical representation helps in understanding the progression and fluctuations in performance over time.

Ratings are dynamic estimates, representing a range of potential future performance outcomes. The box plots above illustrate these ranges, with the red dotted line indicating the "Performance Score" and the solid blue line showing the "Updated Rating". A performance score falling outside the expected range can lead to significant adjustments in the updated rating, reflecting the dynamic nature of performance evaluation.