Jordan DeSimone's Race Results

Below you'll find a detailed table of race results. The "Performance Score" reflects the rating for that specific race, while the "Updated Rating" represents your cumulative rating, influenced by past performances. This distinction is key, as your overall rating is a weighted average that slowly responds to your most recent race's performance score. For a visual representation of how these ratings evolve, refer to the graph below.

Event Date Event Name Race Name Finishing Place Finishing Time Performance Score Updated Rating
2023-08-28 Trojan Early Bird Invitational Mens 5,000 Meters JV Boys 5K 60 22:48.29 1545 1544
2023-09-02 Pleasant Valley Spartan Classic Mens 5,000 Meters Frosh/Soph 114 22:21 1554 1550
2023-09-07 Cedar Rapids Invitational Mens 5,000 Meters Frosh/Soph 41 20:07.31 1781 1704
2023-09-12 North Scott XC Mens 5,000 Meters Varsity Boys 75 20:52.40 1607 1600
2023-09-21 Jim Boughton XC Mens 5,000 Meters Fresh/Soph Boys 82 20:32.59 1583 1591
2023-09-26 Iowa City West Invitational 2023 Varsity Boys 5000 Meter Run Finals 78 21:26 1610 1600
2023-10-05 Jim Hetrick Invitational (Central DeWitt) Mens 5,000 Meters Boys Freshmen/Sophmore 5K 23 20:42.09 1643 1621
2023-10-12 2023 MAC XC Conference Championships FreshSoph Boys 31 20:43.59 1624 1622
2024-09-07 2024 Spartan Challenge Junior Varsity Male 105 21:50 1541 1544
2024-09-12 Cedar Rapids Invitational JV Boys 5K 38 19:35.59 1781 1704
2024-09-19 39th Rich Engel Classic CC 39th Rich Engel Classic CC JV boys 162 21:46.5 1667 1673

Performance Trends Over Time

Explore the visual trends of performance scores and updated ratings across different events. This graphical representation helps in understanding the progression and fluctuations in performance over time.

Ratings are dynamic estimates, representing a range of potential future performance outcomes. The box plots above illustrate these ranges, with the red dotted line indicating the "Performance Score" and the solid blue line showing the "Updated Rating". A performance score falling outside the expected range can lead to significant adjustments in the updated rating, reflecting the dynamic nature of performance evaluation.