Jaxson Pick's Race Results

Below you'll find a detailed table of race results. The "Performance Score" reflects the rating for that specific race, while the "Updated Rating" represents your cumulative rating, influenced by past performances. This distinction is key, as your overall rating is a weighted average that slowly responds to your most recent race's performance score. For a visual representation of how these ratings evolve, refer to the graph below.

Event Date Event Name Race Name Finishing Place Finishing Time Performance Score Updated Rating
2023-09-07 Winterset CC Invite Boys 5k Run HIGH SCHOOL 68 23:50.40 955 983
2023-09-11 43rd Mike Carr Invitational 43rd Mike Carr Invitational XC Meet JV Boys 214 23:51.59 1230 1212
2023-09-15 Tiger Invitational XC Tiger Invit Backup JV Boys 5 km 55 23:29.79 1255 1232
2023-09-28 Perry CC Invite Boys 5k Run Junior Varsity 60 22:20.20 955 945
2023-10-05 Fort Dodge Invite Mens 5,000 Meters Junior Varsity 480 22:59.40 1179 1221
2023-10-10 2023 Raccoon River Conference XC Raccoon River Conference XC JV Boys 5 km 106 22:34.90 1211 1215
2024-09-03 2024 Webster City Invite Boys 5k Purple Division JUNIOR VARSI 80 27:25.70 1016 1021
2024-09-10 Winterset CC Invite Boys 5k Junior Varsity 56 26:08.06 955 983
2024-09-26 Roland Story CC Invite Boys 5k JUNIOR VARSITY 100 25:35.41 904 933
2024-10-03 Perry CC Invite Boys 5k HIGH SCHOOL 128 26:08.39 955 945
2024-10-10 Ft Dodge Cross Country Invite Fort Dodge Cross Country Invite JV boys 537 24:13.09 1035 989
2024-10-15 RRC Conference Meet at Winterset Boys 5k JUNIOR VARSITY 102 23:55.40 1014 1002

Performance Trends Over Time

Explore the visual trends of performance scores and updated ratings across different events. This graphical representation helps in understanding the progression and fluctuations in performance over time.

Ratings are dynamic estimates, representing a range of potential future performance outcomes. The box plots above illustrate these ranges, with the red dotted line indicating the "Performance Score" and the solid blue line showing the "Updated Rating". A performance score falling outside the expected range can lead to significant adjustments in the updated rating, reflecting the dynamic nature of performance evaluation.