Isaac Wilson's Race Results

Below you'll find a detailed table of race results. The "Performance Score" reflects the rating for that specific race, while the "Updated Rating" represents your cumulative rating, influenced by past performances. This distinction is key, as your overall rating is a weighted average that slowly responds to your most recent race's performance score. For a visual representation of how these ratings evolve, refer to the graph below.

Event Date Event Name Race Name Finishing Place Finishing Time Performance Score Updated Rating
2023-08-28 Webster City Lynx CC Invite Boys 5000 Meter Run PURPLE DIVISION 4 18:56.49 2011 2002
2023-09-05 Estherville-Lincoln-Central Meet Mens 5,000 Meters Varsity 6 17:40.29 1990 1995
2023-09-12 Storm Lake 2023 Boys 5000 Meter Run Finals 18 18:06.23 1940 1967
2023-09-18 Humboldt Invitational 2023 Boys 5000 Meter Run Finals 7 19:22.32 1937 1953
2023-09-25 Algona Invitational Mens 5,000 Meters Varsity 36 18:26.38 1857 1909
2023-10-03 Eagle Grove Dick Bell Invitational Boys 5k 7 18:32.15 1927 1919
2023-10-10 NCC Conference Meet Boys 5k Run Varsity 7 18:09.72 1882 1900
2023-10-18 Iowa State Qualifier - 3A - Spencer Mens 5,000 Meters Varsity 37 18:26.02 1857 1878
2024-09-03 2024 Webster City Invite Boys 5k Gold Division VARSITY 13 19:30.20 1823 1825
2024-09-17 Storm Lake XC Meet Boys 5000m Varsity 32 19:29.43 1809 1815
2024-09-23 Humboldt XC Meet Boys 5000m Varsity 20 19:47.58 1787 1801
2024-09-30 Algona CC Invite Boys 5k VARSITY 56 19:52.20 1762 1783
2024-10-15 North Central Conference Meet Boys Varsity 5K 25 19:26.70 1660 1710
2024-10-23 Gilbert 3A District Meet Boys 5k Varsity 59 18:45.79 1690 1697

Performance Trends Over Time

Explore the visual trends of performance scores and updated ratings across different events. This graphical representation helps in understanding the progression and fluctuations in performance over time.

Ratings are dynamic estimates, representing a range of potential future performance outcomes. The box plots above illustrate these ranges, with the red dotted line indicating the "Performance Score" and the solid blue line showing the "Updated Rating". A performance score falling outside the expected range can lead to significant adjustments in the updated rating, reflecting the dynamic nature of performance evaluation.