Ezra Farmer's Race Results

Below you'll find a detailed table of race results. The "Performance Score" reflects the rating for that specific race, while the "Updated Rating" represents your cumulative rating, influenced by past performances. This distinction is key, as your overall rating is a weighted average that slowly responds to your most recent race's performance score. For a visual representation of how these ratings evolve, refer to the graph below.

Event Date Event Name Race Name Finishing Place Finishing Time Performance Score Updated Rating
2023-08-31 Madrid XC Invitational Boys 5k Run HIGH SCHOOL 43 23:58.21 1502 1502
2023-09-07 Winterset CC Invite Boys 5k Run HIGH SCHOOL 62 22:47.50 1663 1662
2023-09-15 Tiger Invitational XC Tiger Invitational XC Varsity Boys 5 km 57 22:35.79 1518 1497
2023-09-21 ACGC CC Invite Boys 5k Run High School 59 23:14.29 1547 1521
2023-09-28 Perry CC Invite Boys 5k Run Varsity 65 21:36.09 1533 1527
2023-10-05 Saydel XC Invitational Mens 5,000 Meters Varsity 76 21:33.59 1547 1537
2023-10-09 HOIAC Conference CC Meet Boys 5k Run High School 56 21:28.55 1550 1542
2023-10-18 Iowa State Qualifier - 3A - Pella Mens 5,000 Meters Varsity 83 22:22.88 1495 1520
2024-08-29 Southeast Valley Invitational Boys 5k Run CC Wave 1 56 22:19.28 1673 1669
2024-09-05 Madrid CC Invite Boys 5k High School 30 21:31.79 1657 1662
2024-09-10 Winterset CC Invite Boys 5k Varsity 48 21:14 1663 1662
2024-09-12 Greene County CC Invite Boys 5k High School 38 21:13.94 1657 1660
2024-09-19 Panorama CC Invite Boys 5k Varsity 73 22:50 1617 1642

Performance Trends Over Time

Explore the visual trends of performance scores and updated ratings across different events. This graphical representation helps in understanding the progression and fluctuations in performance over time.

Ratings are dynamic estimates, representing a range of potential future performance outcomes. The box plots above illustrate these ranges, with the red dotted line indicating the "Performance Score" and the solid blue line showing the "Updated Rating". A performance score falling outside the expected range can lead to significant adjustments in the updated rating, reflecting the dynamic nature of performance evaluation.