Sam Miller's Race Results

Below you'll find a detailed table of race results. The "Performance Score" reflects the rating for that specific race, while the "Updated Rating" represents your cumulative rating, influenced by past performances. This distinction is key, as your overall rating is a weighted average that slowly responds to your most recent race's performance score. For a visual representation of how these ratings evolve, refer to the graph below.

Event Date Event Name Race Name Finishing Place Finishing Time Performance Score Updated Rating
2023-08-31 WC Valley CC Invite Boys 5k Run 44 24:18.05 1652 1650
2023-09-07 Winterset CC Invite Boys 5k Run HIGH SCHOOL 46 20:54.86 1625 1635
2023-09-11 43rd Mike Carr Invitational 43rd Mike Carr Invitational XC Meet JV Boys 152 21:50.79 1585 1613
2023-09-14 PANORAMA CC INVITATIONAL Boys 5k Run CC High School 49 19:52 1890 1664
2023-09-25 Orient-Macksburg CC Invite Boys 5k Run High School 26 22:34.25 1626 1638
2023-10-02 Nodaway Valley Wildcat Invitational Mens 5,000 Meters Varsity 52 23:39.09 1556 1597
2023-10-05 Atlantic Invitational 2023 Varsity Boys 5000 Meter Run Finals 90 21:06.05 1663 1628
2023-10-10 POI Conference Meet Boys 5k Run High School 24 21:50.84 1644 1636
2023-10-12 Mount Ayr CC Invite Boys 5k Run High School 76 21:41.11 1572 1612
2023-10-19 Iowa State Qualifier - 1A - Central Decatur Mens 5,000 Meters Varsity 41 19:58.53 1685 1647
2024-09-03 2024 BHRV Boys 5000m Junior Varsity JV 36 34:38.71 826 839
2024-09-10 Sibley XC Invite Boys 5000m JV 49 34:09.71 829 833
2024-09-23 Alcester-Hudson XC Invite JV 4K Boys 4000y JV 60 19:30.23 1107 1034
2024-10-10 West Sioux Cross Country Meet HS Boys 59 36:23.53 690 757
2024-10-17 WEC Conference XC Meet Boys 5000m 65 30:33.72 872 846

Performance Trends Over Time

Explore the visual trends of performance scores and updated ratings across different events. This graphical representation helps in understanding the progression and fluctuations in performance over time.

Ratings are dynamic estimates, representing a range of potential future performance outcomes. The box plots above illustrate these ranges, with the red dotted line indicating the "Performance Score" and the solid blue line showing the "Updated Rating". A performance score falling outside the expected range can lead to significant adjustments in the updated rating, reflecting the dynamic nature of performance evaluation.