Ty Miller's Race Results

Below you'll find a detailed table of race results. The "Performance Score" reflects the rating for that specific race, while the "Updated Rating" represents your cumulative rating, influenced by past performances. This distinction is key, as your overall rating is a weighted average that slowly responds to your most recent race's performance score. For a visual representation of how these ratings evolve, refer to the graph below.

Event Date Event Name Race Name Finishing Place Finishing Time Performance Score Updated Rating
2023-09-02 Pella Dutch XC Invite Pella Dutch XC Invite Boys 104 20:30.5 1730 1726
2023-09-07 GILBERT CC INVITATIONAL Boys 5k Run CC JUNIOR VARSITY 115 22:51.29 1468 1538
2024-08-31 Dragon Sunrise XC Invite Dragon Sunrise XC Invitational - Boys 32 18:13.5 2057 2049
2024-09-07 2024 Pella HS XC Invite Pella - Dutch XC Invitational Boys 36 18:12.09 2043 2046
2024-09-12 Gilbert CC Invite Boys 5k Varsity 50 17:43.29 2087 2065
2024-09-16 44th Mike Carr CC Invite 44th Mike Carr CC Invite JV boys 6 19:00.70 2019 2046
2024-09-20 Roy Griak Invitational Boys' Gold 5k 108 19:32 2027 2038
2024-09-24 48th Steve McDermott Cardinal CC Invite 48th Steve McDermott Cardinal CC Invite JV boys 3 18:53.29 1989 2019
2024-10-01 Williamsburg Invitational Boys Junior Varsity 5K 7 18:06.20 1993 2007
2024-10-10 Ft Dodge Cross Country Invite Fort Dodge Cross Country Invite JV boys 63 18:39 1945 1977
2024-10-15 RRC Conference Meet at Winterset Boys 5k JUNIOR VARSITY 4 18:11.59 2012 1994

Performance Trends Over Time

Explore the visual trends of performance scores and updated ratings across different events. This graphical representation helps in understanding the progression and fluctuations in performance over time.

Ratings are dynamic estimates, representing a range of potential future performance outcomes. The box plots above illustrate these ranges, with the red dotted line indicating the "Performance Score" and the solid blue line showing the "Updated Rating". A performance score falling outside the expected range can lead to significant adjustments in the updated rating, reflecting the dynamic nature of performance evaluation.