Quinten Veenstra's Race Results

Below you'll find a detailed table of race results. The "Performance Score" reflects the rating for that specific race, while the "Updated Rating" represents your cumulative rating, influenced by past performances. This distinction is key, as your overall rating is a weighted average that slowly responds to your most recent race's performance score. For a visual representation of how these ratings evolve, refer to the graph below.

Event Date Event Name Race Name Finishing Place Finishing Time Performance Score Updated Rating
2023-08-28 Albia Blue Demon-Lady Dee CC Invite Boys 5k Run CC High School 110 31:36 942 952
2023-09-02 Pella Dutch XC Invite Pella Dutch XC Invite Boys 231 32:04.09 896 921
2023-09-07 GILBERT CC INVITATIONAL Boys 5k Run CC JUNIOR VARSITY 176 27:42 1069 986
2023-09-12 Oskaloosa Invite 2023 JV Boys 5000 Meter Run Finals 74 27:41 1151 1075
2023-09-18 PCM CC Invitational Boys 5k Run High School 62 33:09.5 885 954
2023-09-26 Williamsburg September 2023 Mens 5,000 Meters Boys Junior Varsity 5K 152 27:25.09 1082 1051
2023-10-03 Centerville CC Invite Boys 5k Run Junior Varsity 78 27:50.25 1038 1043
2023-10-09 Little Hawkeye Conference XC Little Hawkeye Conference XC Championship 2 - JV Boys 143 29:07.20 992 1016
2024-09-03 2024 DC-G Invitational XC Dallas Center-Grimes Cross Country Boys 5 km 228 32:11.09 955 957
2024-09-07 2024 Pella HS XC Invite Pella - Dutch XC Invitational Boys 166 31:21.90 813 875
2024-09-12 Gilbert CC Invite Boys 5k Junior Varsity 205 30:23.70 809 834
2024-09-16 44th Mike Carr CC Invite 44th Mike Carr CC Invite JV boys 168 26:03.5 1255 935
2024-09-19 Lynnville-Sully Cross Country Invite HS Boys 76 33:34 871 888

Performance Trends Over Time

Explore the visual trends of performance scores and updated ratings across different events. This graphical representation helps in understanding the progression and fluctuations in performance over time.

Ratings are dynamic estimates, representing a range of potential future performance outcomes. The box plots above illustrate these ranges, with the red dotted line indicating the "Performance Score" and the solid blue line showing the "Updated Rating". A performance score falling outside the expected range can lead to significant adjustments in the updated rating, reflecting the dynamic nature of performance evaluation.