Adam Gaul's Race Results

Below you'll find a detailed table of race results. The "Performance Score" reflects the rating for that specific race, while the "Updated Rating" represents your cumulative rating, influenced by past performances. This distinction is key, as your overall rating is a weighted average that slowly responds to your most recent race's performance score. For a visual representation of how these ratings evolve, refer to the graph below.

Event Date Event Name Race Name Finishing Place Finishing Time Performance Score Updated Rating
2023-08-29 Oelwein Invitational Mens 5,000 Meters Boys Varsity 5K 62 20:19.20 1802 1797
2023-09-09 Monticello XC Mens 5,000 Meters Varsity Boys 57 19:12.70 1771 1853
2023-09-12 Starmont Invitational Mens 5,000 Meters Boys Varsity 5K 54 19:23 1910 1885
2023-09-14 Cascade Invitational 2023 Boys 5000 Meter Run Finals 55 20:06.09 1782 1807
2023-09-19 Vinton-Shellsburg Invitational Mens 5,000 Meters Varsity Boys 5K 26 18:56.5 1828 1816
2023-09-28 Western Dubuque Invitational Mens 5,000 Meters Varsity 55 19:44.90 1803 1809
2023-10-03 West Delaware Hawks XC Mens 5,000 Meters Varsity Boys 78 19:17.20 1815 1812
2023-10-10 River Valley Conference XC Meet 2023 Varsity Boys 5000 Meter Run Finals 37 19:19 1827 1819
2023-10-19 Iowa State Qualifier - 1A - North Linn Mens 5,000 Meters Varsity 30 18:41.40 1822 1820
2023-10-27 Iowa State Class 1A Championships Mens 5,000 Meters Varsity 127 19:03.29 1835 1827
2024-09-03 2024 Oelwein Invitational Boys Varsity 5K 57 19:16 1880 1878
2024-09-10 Clayton Ridge CC Men 5k Run 10 19:00.70 1941 1915
2024-09-14 Monticello XC Varsity Boys 72 19:49.70 1771 1853
2024-09-17 Starmont Invitational Boys Varsity 5K 47 19:15.90 1910 1885
2024-09-19 Cascade Invitational Boys 5K 50 20:10.59 1881 1883

Performance Trends Over Time

Explore the visual trends of performance scores and updated ratings across different events. This graphical representation helps in understanding the progression and fluctuations in performance over time.

Ratings are dynamic estimates, representing a range of potential future performance outcomes. The box plots above illustrate these ranges, with the red dotted line indicating the "Performance Score" and the solid blue line showing the "Updated Rating". A performance score falling outside the expected range can lead to significant adjustments in the updated rating, reflecting the dynamic nature of performance evaluation.