Alexandria Palmer's Race Results

Below you'll find a detailed table of race results. The "Performance Score" reflects the rating for that specific race, while the "Updated Rating" represents your cumulative rating, influenced by past performances. This distinction is key, as your overall rating is a weighted average that slowly responds to your most recent race's performance score. For a visual representation of how these ratings evolve, refer to the graph below.

Event Date Event Name Race Name Finishing Place Finishing Time Performance Score Updated Rating
2023-08-29 Spirit Lake Invitational 2023 Varsity Girls 5000 Meter Run Finals 12 22:58.27 1609 1608
2023-09-05 Gary Meyer Memorial Womens 5,000 Meters Varsity 27 21:56.84 1638 1625
2023-09-12 Storm Lake 2023 Girls 5000 Meter Run Finals 24 22:05.52 1583 1604
2023-09-21 Sioux Center XC Invitational 2023 Varsity Girls 5000 Meter Run Finals 17 21:31.32 1630 1617
2023-09-25 Algona Invitational Womens 5,000 Meters Varsity 24 21:50.95 1578 1600
2023-09-30 Steve Johnson Invitational Womens 5,000 Meters Girls Varsity Orange 5000M 79 22:11.90 1602 1601
2023-10-09 Lakes Conference @ Spencer 2023 Girls 5000 Meter Run Finals 4 21:00.88 1616 1609
2023-10-18 Iowa State Qualifier - 3A - Spencer Womens 5,000 Meters Varsity 24 20:48.25 1627 1618
2024-09-05 Spirit Lake/Okoboji XC Meet Girls 5000m Varsity 20 21:53.61 1624 1623
2024-09-10 Lemars XC Invite Girls 5000m Varsity 27 23:24.61 1639 1632
2024-09-17 Storm Lake XC Meet Girls 5000m Varsity 26 23:10.04 1543 1590

Performance Trends Over Time

Explore the visual trends of performance scores and updated ratings across different events. This graphical representation helps in understanding the progression and fluctuations in performance over time.

Ratings are dynamic estimates, representing a range of potential future performance outcomes. The box plots above illustrate these ranges, with the red dotted line indicating the "Performance Score" and the solid blue line showing the "Updated Rating". A performance score falling outside the expected range can lead to significant adjustments in the updated rating, reflecting the dynamic nature of performance evaluation.