Naruto Menchaca's Race Results

Below you'll find a detailed table of race results. The "Performance Score" reflects the rating for that specific race, while the "Updated Rating" represents your cumulative rating, influenced by past performances. This distinction is key, as your overall rating is a weighted average that slowly responds to your most recent race's performance score. For a visual representation of how these ratings evolve, refer to the graph below.

Event Date Event Name Race Name Finishing Place Finishing Time Performance Score Updated Rating
2023-08-31 Okoboji Invitational 2023 JV Boys 5000 Meter Run Finals 30 24:40.85 1428 1429
2023-09-05 Estherville-Lincoln-Central Meet Mens 5,000 Meters Varsity 76 26:19.94 1323 1368
2023-09-09 Tim Thomas XC Classic 2023 Division B Boys 5000 Meter Run Finals 16 24:20.07 1429 1402
2023-09-14 Chris Smith Invitational 2023 JV Boys 5000 Meter Run Finals 50 27:25.67 1205 1323
2023-09-20 Hartley-Melvin-Sanborn Invitational 2023 JV Boys 5000 Meter Run Finals 3 24:52.08 1408 1380
2023-09-25 Alta-Aurelia Invitational 2023 JV Boys 5000 Meter Run Finals 10 23:50.52 1463 1420
2023-10-03 South Central Calhoun Titan Invite Mens 5,000 Meters Boys 5000 Meter Run Junior Varsity 6 22:49.73 1525 1472
2023-10-09 OA-BCIG 2023 Varsity Boys 5000 Meter Run Finals 85 22:58.40 1438 1453
2024-09-10 ELC XC Meet Boys 5000m High School 59 21:45.16 1546 1543
2024-09-14 Tim Thomas Classic Boys 5000m High School Class B 96 22:01.93 1605 1577
2024-09-17 2024 Chris Smith Invitational JV Boys 21 22:53.46 1529 1555
2024-09-23 HMS Invitational HS Boys 32 21:34.89 1627 1589
2024-10-05 PAC XC Meet Boys 5000m High School 50 21:05.73 1580 1583
2024-10-08 Brian Knapp SCC CC Invite HS Boys 70 22:07.56 1562 1574
2024-10-14 OA-BCIG XC Meet Boys 5000m High School 69 22:10.98 1507 1545

Performance Trends Over Time

Explore the visual trends of performance scores and updated ratings across different events. This graphical representation helps in understanding the progression and fluctuations in performance over time.

Ratings are dynamic estimates, representing a range of potential future performance outcomes. The box plots above illustrate these ranges, with the red dotted line indicating the "Performance Score" and the solid blue line showing the "Updated Rating". A performance score falling outside the expected range can lead to significant adjustments in the updated rating, reflecting the dynamic nature of performance evaluation.