Keagan VandeHoef's Race Results

Below you'll find a detailed table of race results. The "Performance Score" reflects the rating for that specific race, while the "Updated Rating" represents your cumulative rating, influenced by past performances. This distinction is key, as your overall rating is a weighted average that slowly responds to your most recent race's performance score. For a visual representation of how these ratings evolve, refer to the graph below.

Event Date Event Name Race Name Finishing Place Finishing Time Performance Score Updated Rating
2023-08-29 Spirit Lake Invitational 2023 JV Boys 5000 Meter Run Finals 11 21:16.85 1730 1727
2023-09-05 Estherville-Lincoln-Central Meet Mens 5,000 Meters Varsity 22 19:51.93 1836 1792
2023-09-12 Storm Lake 2023 Boys 5000 Meter Run Finals 57 19:54.97 1791 1791
2023-09-14 Chris Smith Invitational 2023 Varsity Boys 5000 Meter Run Finals 51 19:56.66 1824 1805
2023-09-25 Algona Invitational Mens 5,000 Meters Varsity 64 19:38.92 1837 1822
2023-10-03 Cherokee XC Meet 2023 Varsity Boys 5000 Meter Run Finals 37 19:18.02 1869 1845
2023-10-09 Lakes Conference @ Spencer 2023 Boys 5000 Meter Run Finals 22 19:02 1862 1853
2023-10-19 Iowa State Qualifier - 2A - Unity Christian Mens 5,000 Meters Varsity 32 18:48.49 1953 1903
2023-10-28 Iowa State Class 2A Championships Mens 5,000 Meters Varsity 111 18:35.5 1895 1898
2024-09-05 Spirit Lake/Okoboji XC Meet Boys 5000m Varsity 59 19:03.52 1981 1978
2024-09-10 ELC XC Meet Boys 5000m High School 19 18:44.05 1938 1956
2024-09-14 Heartland Preview 2024 Boys 5000m Varsity 153 19:14.5 1971 1963
2024-09-17 2024 Chris Smith Invitational Varsity Boys 25 18:46.52 2043 1991

Performance Trends Over Time

Explore the visual trends of performance scores and updated ratings across different events. This graphical representation helps in understanding the progression and fluctuations in performance over time.

Ratings are dynamic estimates, representing a range of potential future performance outcomes. The box plots above illustrate these ranges, with the red dotted line indicating the "Performance Score" and the solid blue line showing the "Updated Rating". A performance score falling outside the expected range can lead to significant adjustments in the updated rating, reflecting the dynamic nature of performance evaluation.