Raiden Jimenez's Race Results

Below you'll find a detailed table of race results. The "Performance Score" reflects the rating for that specific race, while the "Updated Rating" represents your cumulative rating, influenced by past performances. This distinction is key, as your overall rating is a weighted average that slowly responds to your most recent race's performance score. For a visual representation of how these ratings evolve, refer to the graph below.

Event Date Event Name Race Name Finishing Place Finishing Time Performance Score Updated Rating
2023-08-31 WAYNE CC INVITATIONAL Boys 5k Run CC HIGH SCHOOL 66 22:32.93 1583 1581
2023-09-11 PLEASANTVILLE TROJAN INVITATIONAL Boys 5k Run CC High School 58 20:11.40 1633 1613
2023-09-14 I-35 CC Invite Boys 5k Run High School 18 24:31.5 1849 1754
2023-09-26 Clarke CC Invitational Boys 5k Run High School 83 27:23.09 1232 1448
2023-09-28 Chariton Invitational XC Chariton Invitational XC Boys 5 km 72 21:50.59 1533 1521
2023-10-02 Nodaway Valley Wildcat Invitational Mens 5,000 Meters Varsity 64 24:54 1455 1482
2023-10-10 POI Conference Meet Boys 5k Run High School 41 24:28.47 1417 1443
2023-10-19 Iowa State Qualifier - 1A - Central Decatur Mens 5,000 Meters Varsity 51 20:40.32 1577 1524
2024-09-05 Wayne CC Invite Boys 5k High School 54 21:30.71 1614 1611
2024-09-10 Central Decatur Invite Boys 5k 23 21:30.32 1636 1625
2024-09-16 Pleasantville CC Invite Boys 5k HIGH SCHOOL 36 20:04.30 1753 1681
2024-09-19 I-35 CC Invite Boys 5k HIGH SCHOOL 6 21:00.31 1849 1754

Performance Trends Over Time

Explore the visual trends of performance scores and updated ratings across different events. This graphical representation helps in understanding the progression and fluctuations in performance over time.

Ratings are dynamic estimates, representing a range of potential future performance outcomes. The box plots above illustrate these ranges, with the red dotted line indicating the "Performance Score" and the solid blue line showing the "Updated Rating". A performance score falling outside the expected range can lead to significant adjustments in the updated rating, reflecting the dynamic nature of performance evaluation.