Jonah VanderWilt's Race Results

Below you'll find a detailed table of race results. The "Performance Score" reflects the rating for that specific race, while the "Updated Rating" represents your cumulative rating, influenced by past performances. This distinction is key, as your overall rating is a weighted average that slowly responds to your most recent race's performance score. For a visual representation of how these ratings evolve, refer to the graph below.

Event Date Event Name Race Name Finishing Place Finishing Time Performance Score Updated Rating
2023-08-26 Iowa Falls-Alden XC Mens 5,000 Meters Varsity Boys 32 21:28.90 1808 1803
2023-08-31 South Hardin XC @ Pine Lake Country Club 5,000 Meters Varsity Boys 61 21:30 1803 1803
2023-09-07 Union Invitational Mens 5,000 Meters Boys 5K 46 20:52.40 1650 1732
2023-09-11 South Tama Invitational Mens 5,000 Meters Varsity Boys 59 21:30.20 1641 1676
2023-09-16 BCLUW Comet Invite Boys 5k Run High School 20 20:40.61 1701 1690
2023-09-21 Sam Iverson Invitational (Grundy Center) Mens 5,000 Meters Boys Varsity 5K 58 21:04.79 1673 1682
2023-09-25 Nevada XC Invitational Mens 5,000 Meters Varsity Boys 61 21:52.29 1607 1652
2023-09-30 South Hardin Invitational Mens 5,000 Meters Boys Varsity 5K 10 21:19 1804 1711
2023-10-03 Eagle Grove Dick Bell Invitational Boys 5k 51 21:24.43 1651 1677
2023-10-11 NICL Conference Meet Mens 5,000 Meters Boys Varsity 5K 55 19:16.20 1726 1706
2023-10-19 2023 Class 1A State Qualifier @ South Hardin Mens 5,000 Meters Varsity Boys 33 20:51.70 1743 1727
2024-09-05 South Hardin XC Varsity Boys 60 22:17.40 1691 1692
2024-09-12 Greene County CC Invite Boys 5k High School 25 20:17.25 1793 1753
2024-09-16 South Tama County CC Invitational Varsity Boys 29 20:30 1806 1781

Performance Trends Over Time

Explore the visual trends of performance scores and updated ratings across different events. This graphical representation helps in understanding the progression and fluctuations in performance over time.

Ratings are dynamic estimates, representing a range of potential future performance outcomes. The box plots above illustrate these ranges, with the red dotted line indicating the "Performance Score" and the solid blue line showing the "Updated Rating". A performance score falling outside the expected range can lead to significant adjustments in the updated rating, reflecting the dynamic nature of performance evaluation.