Alex Hernandez's Race Results

Below you'll find a detailed table of race results. The "Performance Score" reflects the rating for that specific race, while the "Updated Rating" represents your cumulative rating, influenced by past performances. This distinction is key, as your overall rating is a weighted average that slowly responds to your most recent race's performance score. For a visual representation of how these ratings evolve, refer to the graph below.

Event Date Event Name Race Name Finishing Place Finishing Time Performance Score Updated Rating
2023-08-28 Woodward Granger Invitational 5th Annual Woodward-Granger XC Boys 5 km 25 24:52.40 1676 1673
2023-08-31 WC Valley CC Invite Boys 5k Run 58 25:56.04 1556 1607
2023-09-07 COLFAX-MINGO TIGERHAWK CC INVITE Boys 5k Run CC HIGH SCHOOL 64 22:42.04 1534 1563
2023-09-11 PLEASANTVILLE TROJAN INVITATIONAL Boys 5k Run CC High School 96 23:01 1397 1505
2023-09-15 Tiger Invitational XC Tiger Invitational XC Varsity Boys 5 km 59 22:54.70 1499 1502
2023-09-21 Roland Story CC Invite Boys 5k Run Varsity 71 23:22.76 1429 1464
2023-09-28 Perry CC Invite Boys 5k Run Varsity 71 22:44.59 1599 1606
2023-10-05 Saydel XC Invitational Mens 5,000 Meters Varsity 98 22:34.5 1425 1444
2023-10-09 HOIAC Conference CC Meet Boys 5k Run High School 88 23:32.75 1334 1403
2024-09-03 2024 Woodward-Granger CC 6th Woodward-Granger xc meet - Boys 39 23:02.90 1597 1593
2024-09-05 West Central Valley Invite Boys 5k High School 52 23:30.5 1527 1557
2024-09-16 Pleasantville CC Invite Boys 5k HIGH SCHOOL 50 20:53.25 1669 1622
2024-10-03 Perry CC Invite Boys 5k HIGH SCHOOL 72 21:56.81 1599 1606
2024-10-07 North Polk MS/HS Invite Boys 5k HIGH SCHOOL 99 21:06.70 1614 1610
2024-10-14 HOIC High School Boys 73 22:40.40 1424 1538

Performance Trends Over Time

Explore the visual trends of performance scores and updated ratings across different events. This graphical representation helps in understanding the progression and fluctuations in performance over time.

Ratings are dynamic estimates, representing a range of potential future performance outcomes. The box plots above illustrate these ranges, with the red dotted line indicating the "Performance Score" and the solid blue line showing the "Updated Rating". A performance score falling outside the expected range can lead to significant adjustments in the updated rating, reflecting the dynamic nature of performance evaluation.