Joe Shaver's Race Results

Below you'll find a detailed table of race results. The "Performance Score" reflects the rating for that specific race, while the "Updated Rating" represents your cumulative rating, influenced by past performances. This distinction is key, as your overall rating is a weighted average that slowly responds to your most recent race's performance score. For a visual representation of how these ratings evolve, refer to the graph below.

Event Date Event Name Race Name Finishing Place Finishing Time Performance Score Updated Rating
2023-08-29 Williamsburg Invitational Mens 5,000 Meters Varsity 48 21:20 1517 1517
2023-09-07 Davis County CC Invite Boys 5k Run HIGH SCHOOL 14 20:58.11 1652 1629
2023-09-11 PLEASANTVILLE TROJAN INVITATIONAL Boys 5k Run CC High School 24 18:40.20 1687 1634
2023-09-18 PCM CC Invitational Boys 5k Run High School 28 21:30.20 1519 1567
2023-09-28 Chariton Invitational XC Chariton Invitational XC Boys 5 km 38 19:40.20 1585 1579
2023-10-03 Centerville CC Invite Boys 5k Run Varsity 53 19:18.10 1622 1601
2023-10-09 HOIAC Conference CC Meet Boys 5k Run High School 38 20:13.20 1559 1581
2023-10-19 Iowa State Qualifier - 2A - Pella Christian Mens 5,000 Meters Varsity 69 19:58.79 1513 1545
2024-09-03 2024 Williamsburg Raider Invitational Varsity Boys 5K 49 20:11.40 1598 1596
2024-09-12 Davis County CC Invite Boys 5k High School 15 21:12.89 1652 1629
2024-09-17 Oskaloosa Invite - 2024 HS Boys 43 20:02.90 1691 1659
2024-09-23 PCM CC Invite Boys 5k High School 25 20:14.40 1652 1656
2024-09-30 Nevada Cubs Varsity Boys 43 20:28.90 1627 1642
2024-10-08 Centerville Invite Boys 5k HS Varsity 50 19:04.5 1596 1619
2024-10-14 HOIC High School Boys 35 19:24.59 1633 1626
2024-10-24 Iowa 2A SQM @ Red Oak Boys 5000m 48 20:16.42 1678 1653

Performance Trends Over Time

Explore the visual trends of performance scores and updated ratings across different events. This graphical representation helps in understanding the progression and fluctuations in performance over time.

Ratings are dynamic estimates, representing a range of potential future performance outcomes. The box plots above illustrate these ranges, with the red dotted line indicating the "Performance Score" and the solid blue line showing the "Updated Rating". A performance score falling outside the expected range can lead to significant adjustments in the updated rating, reflecting the dynamic nature of performance evaluation.