Parker Messerich's Race Results

Below you'll find a detailed table of race results. The "Performance Score" reflects the rating for that specific race, while the "Updated Rating" represents your cumulative rating, influenced by past performances. This distinction is key, as your overall rating is a weighted average that slowly responds to your most recent race's performance score. For a visual representation of how these ratings evolve, refer to the graph below.

Event Date Event Name Race Name Finishing Place Finishing Time Performance Score Updated Rating
2023-08-29 Clinton Schoolhouse Open 2023 Varsity Boys 5000 Meter Run Finals 23 19:37.40 1867 1861
2023-09-09 Monticello XC Mens 5,000 Meters Varsity Boys 50 19:00.40 1825 1839
2023-09-11 Midland XC Mens 5,000 Meters Varsity Boys 3 19:49.40 1829 1807
2023-09-18 Comet Cross Country Invitational XC Mens 5,000 Meters Varsity Boys 6 18:32.90 1908 1861
2023-09-25 Bill Bails Invitational (North Cedar) Mens 5,000 Meters Boys Varsity 5K 3 18:50.79 1294 1725
2023-10-05 Jim Hetrick Invitational (Central DeWitt) Mens 5,000 Meters Boys Varsity 5K 47 18:40.20 1858 1819
2023-10-10 River Valley Conference XC Meet 2023 Varsity Boys 5000 Meter Run Finals 41 19:27 1807 1851
2023-10-19 Iowa State Qualifier - 2A - Monticello Mens 5,000 Meters Varsity 34 18:14.40 1883 1870
2024-09-03 2024 Clinton Schoolhouse Open Varsity Boys 44 20:12.20 1762 1765
2024-09-16 Midland XC High School Boys 5 19:37.59 1829 1807
2024-09-23 Bellevue Invitational Varsity Boys 13 18:38.09 1821 1815
2024-09-30 Bill Bails Invitational (North Cedar) Boys Varsity 5K 60 25:08.29 1294 1725
2024-10-10 Jim Hetrick Invitational (Central DeWitt) Boys Varsity 5K 70 18:56.09 1858 1819
2024-10-24 2A State Qualifier @ Monticello High School Boys 39 18:47.40 1858 1844

Performance Trends Over Time

Explore the visual trends of performance scores and updated ratings across different events. This graphical representation helps in understanding the progression and fluctuations in performance over time.

Ratings are dynamic estimates, representing a range of potential future performance outcomes. The box plots above illustrate these ranges, with the red dotted line indicating the "Performance Score" and the solid blue line showing the "Updated Rating". A performance score falling outside the expected range can lead to significant adjustments in the updated rating, reflecting the dynamic nature of performance evaluation.