Jesse Stultz's Race Results

Below you'll find a detailed table of race results. The "Performance Score" reflects the rating for that specific race, while the "Updated Rating" represents your cumulative rating, influenced by past performances. This distinction is key, as your overall rating is a weighted average that slowly responds to your most recent race's performance score. For a visual representation of how these ratings evolve, refer to the graph below.

Event Date Event Name Race Name Finishing Place Finishing Time Performance Score Updated Rating
2023-08-28 Trojan Early Bird Invitational Mens 5,000 Meters Varsity Boys 5K 45 20:56.09 1702 1698
2023-09-02 Pella Dutch XC Invite Pella Dutch XC Invite Boys 70 19:30 1836 1778
2023-09-09 Monticello XC Mens 5,000 Meters Varsity Boys 49 18:58.59 1944 1950
2023-09-19 Mt. Pleasant Invitational 2023 Small School Boys 5000 Meter Run Finals 16 19:31.27 1864 1840
2023-09-25 Clipper CC Classic Mens 5,000 Meters Boys 5K 24 19:59.5 1797 1818
2023-09-30 Steve Johnson Invitational Mens 5,000 Meters Boys Varsity Orange 5000M 248 19:53.29 1829 1823
2023-10-10 River Valley Conference XC Meet 2023 Varsity Boys 5000 Meter Run Finals 31 19:03 1859 1842
2023-10-19 Iowa State Qualifier - 2A - Williamsburg Mens 5,000 Meters Varsity 27 18:52.90 1884 1864
2023-10-28 Iowa State Class 2A Championships Mens 5,000 Meters Varsity 100 18:16.40 1945 1905
2024-09-03 2024 Williamsburg Raider Invitational Varsity Boys 5K 27 18:57.79 1961 1959
2024-09-14 Monticello XC Varsity Boys 44 18:30 1944 1950

Performance Trends Over Time

Explore the visual trends of performance scores and updated ratings across different events. This graphical representation helps in understanding the progression and fluctuations in performance over time.

Ratings are dynamic estimates, representing a range of potential future performance outcomes. The box plots above illustrate these ranges, with the red dotted line indicating the "Performance Score" and the solid blue line showing the "Updated Rating". A performance score falling outside the expected range can lead to significant adjustments in the updated rating, reflecting the dynamic nature of performance evaluation.