Milton Burkhart's Race Results

Below you'll find a detailed table of race results. The "Performance Score" reflects the rating for that specific race, while the "Updated Rating" represents your cumulative rating, influenced by past performances. This distinction is key, as your overall rating is a weighted average that slowly responds to your most recent race's performance score. For a visual representation of how these ratings evolve, refer to the graph below.

Event Date Event Name Race Name Finishing Place Finishing Time Performance Score Updated Rating
2023-08-28 Albia Blue Demon-Lady Dee CC Invite Boys 5k Run CC High School 25 19:41.79 1744 1740
2023-09-07 COLFAX-MINGO TIGERHAWK CC INVITE Boys 5k Run CC HIGH SCHOOL 6 18:32 1898 1846
2023-09-11 PLEASANTVILLE TROJAN INVITATIONAL Boys 5k Run CC High School 10 17:41.5 1877 1865
2023-09-26 Ogden CC Invite Boys 5k Run High School 10 18:21.96 1909 1892
2023-10-05 Saydel XC Invitational Mens 5,000 Meters Varsity 20 18:26.40 1834 1859
2023-10-12 Mount Ayr CC Invite Boys 5k Run High School 11 18:41.33 1889 1875
2023-10-19 Iowa State Qualifier - 1A - Mount Ayr Mens 5,000 Meters Varsity 11 18:17.5 1829 1852
2023-10-27 Iowa State Class 1A Championships Mens 5,000 Meters Varsity 135 19:33.09 1613 1766
2024-09-03 2024 Woodward-Granger CC 6th Woodward-Granger xc meet - Boys 8 19:41.40 1891 1887
2024-10-01 Ogden Cross Country Meet HS Boys 20 18:44.29 1784 1806
2024-10-07 North Polk MS/HS Invite Boys 5k HIGH SCHOOL 32 18:32.29 1794 1799
2024-10-14 HOIC High School Boys 16 18:48.70 1810 1805
2024-10-17 Mt Ayr CC Invite Boys 5k HIGH SCHOOL 6 18:21.29 1842 1820
2024-10-24 1A SQM at South Hamilton 1A State Qualifying XC Boys 5 km 14 18:16.20 1854 1836

Performance Trends Over Time

Explore the visual trends of performance scores and updated ratings across different events. This graphical representation helps in understanding the progression and fluctuations in performance over time.

Ratings are dynamic estimates, representing a range of potential future performance outcomes. The box plots above illustrate these ranges, with the red dotted line indicating the "Performance Score" and the solid blue line showing the "Updated Rating". A performance score falling outside the expected range can lead to significant adjustments in the updated rating, reflecting the dynamic nature of performance evaluation.