Below you'll find a detailed table of race results. The "Performance Score" reflects the rating for that specific race, while the "Updated Rating" represents your cumulative rating, influenced by past performances. This distinction is key, as your overall rating is a weighted average that slowly responds to your most recent race's performance score. For a visual representation of how these ratings evolve, refer to the graph below.
Event Date | Event Name | Race Name | Finishing Place | Finishing Time | Performance Score | Updated Rating |
---|---|---|---|---|---|---|
2023-09-21 | 2023 Burlington XC Invitational | Junior Varsity Male | 1 | 19:44 | 1773 | 1768 |
2023-09-26 | Washington Invitational 2023 | Varsity Boys 5000 Meter Run Finals | 41 | 19:47.28 | 1743 | 1754 |
2023-10-05 | Jim Hetrick Invitational (Central DeWitt) | Mens 5,000 Meters Boys Freshmen/Sophmore 5K | 29 | 20:58.20 | 1631 | 1745 |
2023-10-12 | 2023 Southeast Conference XC Championships | Varsity Boys | 35 | 20:02.29 | 1714 | 1703 |
2023-10-18 | Iowa State Qualifier - 4A - Iowa City, West | Mens 5,000 Meters Varsity | 54 | 19:28.5 | 1707 | 1705 |
2024-09-07 | 2024 Spartan Challenge | Varsity Male | 90 | 19:20 | 1826 | 1822 |
2024-09-12 | Fairfield Invitational XC | HS Boys | 35 | 19:13 | 1939 | 1889 |
2024-09-19 | Timm Lamb Cross Country Invitational | VARSITY BOYS A | 33 | 20:20.79 | 1769 | 1817 |
2024-09-26 | 2024 Burltington XC Invitational | Varsity Boys | 12 | 19:54 | 1869 | 1849 |
2024-10-01 | Washington Invitational | HS Boys | 31 | 19:35.16 | 1822 | 1835 |
2024-10-10 | Jim Hetrick Invitational (Central DeWitt) | Boys Varsity 5K | 93 | 20:43.40 | 1631 | 1745 |
2024-10-17 | Southeast Conference XC Championships | HS Boys | 24 | 19:28.09 | 1789 | 1778 |
2024-10-23 | 4A SQM Pleasant Valley | Boys Varsity | 59 | 19:22 | 1815 | 1797 |
Explore the visual trends of performance scores and updated ratings across different events. This graphical representation helps in understanding the progression and fluctuations in performance over time.
Ratings are dynamic estimates, representing a range of potential future performance outcomes. The box plots above illustrate these ranges, with the red dotted line indicating the "Performance Score" and the solid blue line showing the "Updated Rating". A performance score falling outside the expected range can lead to significant adjustments in the updated rating, reflecting the dynamic nature of performance evaluation.