Antonio Perez's Race Results

Below you'll find a detailed table of race results. The "Performance Score" reflects the rating for that specific race, while the "Updated Rating" represents your cumulative rating, influenced by past performances. This distinction is key, as your overall rating is a weighted average that slowly responds to your most recent race's performance score. For a visual representation of how these ratings evolve, refer to the graph below.

Event Date Event Name Race Name Finishing Place Finishing Time Performance Score Updated Rating
2023-08-31 Okoboji Invitational 2023 JV Boys 5000 Meter Run Finals 46 29:20.51 1112 1118
2023-09-05 Estherville-Lincoln-Central Meet Mens 5,000 Meters Varsity 84 31:09.85 1030 1070
2023-09-09 Tim Thomas XC Classic 2023 Division B Boys 5000 Meter Run Finals 21 25:57.66 1302 1153
2023-09-14 Chris Smith Invitational 2023 JV Boys 5000 Meter Run Finals 41 25:29.95 1314 1270
2023-09-20 Hartley-Melvin-Sanborn Invitational 2023 JV Boys 5000 Meter Run Finals 5 26:41.77 1307 1291
2023-09-25 Alta-Aurelia Invitational 2023 JV Boys 5000 Meter Run Finals 19 26:04.46 1297 1294
2023-09-30 Pocahontas Invitational 2023 Varsity Boys 5000 Meter Run Finals 64 23:15.80 1427 1339
2023-10-03 South Central Calhoun Titan Invite Mens 5,000 Meters Boys 5000 Meter Run Junior Varsity 23 25:07.65 1311 1325
2023-10-09 OA-BCIG 2023 Varsity Boys 5000 Meter Run Finals 98 24:36.13 1312 1318
2023-10-14 Twin Lakes Conference XC Meet Boys 5k Run High School 52 23:06.41 1459 1375

Performance Trends Over Time

Explore the visual trends of performance scores and updated ratings across different events. This graphical representation helps in understanding the progression and fluctuations in performance over time.

Ratings are dynamic estimates, representing a range of potential future performance outcomes. The box plots above illustrate these ranges, with the red dotted line indicating the "Performance Score" and the solid blue line showing the "Updated Rating". A performance score falling outside the expected range can lead to significant adjustments in the updated rating, reflecting the dynamic nature of performance evaluation.