Connor Light's Race Results

Below you'll find a detailed table of race results. The "Performance Score" reflects the rating for that specific race, while the "Updated Rating" represents your cumulative rating, influenced by past performances. This distinction is key, as your overall rating is a weighted average that slowly responds to your most recent race's performance score. For a visual representation of how these ratings evolve, refer to the graph below.

Event Date Event Name Race Name Finishing Place Finishing Time Performance Score Updated Rating
2023-08-31 WC Valley CC Invite Boys 5k Run 60 26:00.00 1371 1373
2023-09-07 Audubon Wheeler Cross Country Invitational BOYS HIGH SCHOOL RACE 41 26:12.09 1235 1288
2023-09-09 Green County Cross Country Invitational 2023 Varsity Boys 5000 Meter Run Finals 29 25:31 1321 1308
2023-09-14 PANORAMA CC INVITATIONAL Boys 5k Run CC High School 178 24:59 1184 1250
2023-09-15 Tiger Invitational XC Tiger Invitational XC Varsity Boys 5 km 62 23:16.09 1262 1256
2023-09-21 ACGC CC Invite Boys 5k Run High School 62 23:24.5 1334 1293
2023-09-25 Orient-Macksburg CC Invite Boys 5k Run High School 32 23:28.63 1301 1297
2023-09-28 WC Valley Wildcat Invite Boys 5k Run High School 51 25:43.20 1140 1249
2023-10-02 Nodaway Valley Wildcat Invitational Mens 5,000 Meters Varsity 67 25:29.5 1259 1255
2023-10-11 WCAC Conference CC Meet Boys 5k Run High School 85 21:13.5 1350 1305
2023-10-19 Iowa State Qualifier - 2A - Pella Christian Mens 5,000 Meters Varsity 85 22:17.74 1258 1277

Performance Trends Over Time

Explore the visual trends of performance scores and updated ratings across different events. This graphical representation helps in understanding the progression and fluctuations in performance over time.

Ratings are dynamic estimates, representing a range of potential future performance outcomes. The box plots above illustrate these ranges, with the red dotted line indicating the "Performance Score" and the solid blue line showing the "Updated Rating". A performance score falling outside the expected range can lead to significant adjustments in the updated rating, reflecting the dynamic nature of performance evaluation.