Simeon Weers's Race Results

Below you'll find a detailed table of race results. The "Performance Score" reflects the rating for that specific race, while the "Updated Rating" represents your cumulative rating, influenced by past performances. This distinction is key, as your overall rating is a weighted average that slowly responds to your most recent race's performance score. For a visual representation of how these ratings evolve, refer to the graph below.

Event Date Event Name Race Name Finishing Place Finishing Time Performance Score Updated Rating
2023-08-29 Shenandoah Invitational 2023 Boys 5000 Meter Run Finals 29 21:03.26 1781 1777
2023-08-31 Logan-Magnolia Invitational 2023 Varsity Boys 5000 Meter Run Finals 26 18:12.26 1863 1821
2023-09-05 Treynor XC Invitational Mens 5,000 Meters Varsity 20 21:00.40 1842 1832
2023-09-07 Audubon Wheeler Cross Country Invitational BOYS HIGH SCHOOL RACE 10 19:32.40 1886 1852
2023-09-14 PANORAMA CC INVITATIONAL Boys 5k Run CC High School 71 20:35 1780 1819
2023-09-19 Tri-Center Neola Invitational 2023 Varsity Boys 5000 Meter Run Finals 28 19:34.78 1857 1838
2023-09-21 ACGC CC Invite Boys 5k Run High School 24 20:21.5 1861 1847
2023-09-26 Denison-Schleswig XC Meet 2023 Varsity Boys 5000 Meter Run Finals 35 19:52.76 1880 1860
2023-10-02 Nodaway Valley Wildcat Invitational Mens 5,000 Meters Varsity 9 19:44.70 1952 1897
2023-10-09 2023 Western Iowa Conference Cross Country Meet Varsity Boys 9 18:44.40 1961 1931
2023-10-19 Iowa State Qualifier - 1A - Panorama Mens 5,000 Meters Varsity 20 18:52.90 1975 1955

Performance Trends Over Time

Explore the visual trends of performance scores and updated ratings across different events. This graphical representation helps in understanding the progression and fluctuations in performance over time.

Ratings are dynamic estimates, representing a range of potential future performance outcomes. The box plots above illustrate these ranges, with the red dotted line indicating the "Performance Score" and the solid blue line showing the "Updated Rating". A performance score falling outside the expected range can lead to significant adjustments in the updated rating, reflecting the dynamic nature of performance evaluation.