Xavier Rangel's Race Results

Below you'll find a detailed table of race results. The "Performance Score" reflects the rating for that specific race, while the "Updated Rating" represents your cumulative rating, influenced by past performances. This distinction is key, as your overall rating is a weighted average that slowly responds to your most recent race's performance score. For a visual representation of how these ratings evolve, refer to the graph below.

Event Date Event Name Race Name Finishing Place Finishing Time Performance Score Updated Rating
2023-08-31 Logan-Magnolia Invitational 2023 Varsity Boys 5000 Meter Run Finals 57 20:18.45 1635 1632
2023-09-02 Abraham Lincoln Lynx CC Invitational Mens 5,000 Meters Varsity 32 23:37.40 1600 1616
2023-09-05 Treynor XC Invitational Mens 5,000 Meters Varsity 54 26:18.83 1405 1561
2023-09-12 AHSTW Cross Country Meet BOYS HIGH SCHOOL RACE 56 20:02.40 1879 1891
2023-09-19 Tri-Center Neola Invitational 2023 Varsity Boys 5000 Meter Run Finals 69 22:26.10 1561 1579
2023-09-26 Denison-Schleswig XC Meet 2023 Varsity Boys 5000 Meter Run Finals 68 21:31.36 1689 1634
2023-10-05 Boyer Valley/Rolling Valley Invitational Mens 5,000 Meters 5000 35 20:51.29 1621 1626
2023-10-09 2023 Western Iowa Conference Cross Country Meet Varsity Boys 29 21:07.40 1668 1645
2023-10-14 2023 Missouri Valley Cross Country Invitational Varsity Boys 35 19:56.79 1666 1655
2023-10-19 Iowa State Qualifier - 1A - Panorama Mens 5,000 Meters Varsity 53 22:20 1566 1618
2024-09-05 Logan-Magnolia XC Meet Boys 5000m High School 28 19:55.93 1872 1866
2024-09-07 55th Annual Abraham Lincoln HS CC Invite Boys 5k 18 20:26.90 1913 1890
2024-09-10 Treynor Invite Boys 5000m Varsity 22 20:13.24 1914 1901
2024-09-17 AHSTW Cross Country Meet Boys HS Race 35 20:29.90 1879 1891

Performance Trends Over Time

Explore the visual trends of performance scores and updated ratings across different events. This graphical representation helps in understanding the progression and fluctuations in performance over time.

Ratings are dynamic estimates, representing a range of potential future performance outcomes. The box plots above illustrate these ranges, with the red dotted line indicating the "Performance Score" and the solid blue line showing the "Updated Rating". A performance score falling outside the expected range can lead to significant adjustments in the updated rating, reflecting the dynamic nature of performance evaluation.