Below you'll find a detailed table of race results. The "Performance Score" reflects the rating for that specific race, while the "Updated Rating" represents your cumulative rating, influenced by past performances. This distinction is key, as your overall rating is a weighted average that slowly responds to your most recent race's performance score. For a visual representation of how these ratings evolve, refer to the graph below.
Event Date | Event Name | Race Name | Finishing Place | Finishing Time | Performance Score | Updated Rating |
---|---|---|---|---|---|---|
2023-08-29 | Oelwein Invitational | Mens 5,000 Meters Boys Varsity 5K | 60 | 20:09.09 | 1834 | 1829 |
2023-09-12 | Green Devils Invitational | Mens 5,000 Meters Varsity | 24 | 19:42.29 | 1845 | 1839 |
2023-09-19 | Waukon Invitational | Mens 5,000 Meters Varsity | 23 | 19:04.38 | 1920 | 1912 |
2023-09-30 | Crestwood Invitational | Mens 5,000 Meters Varsity | 7 | 19:45.59 | 1896 | 1902 |
2023-10-05 | New Hampton Invitational | Mens 5,000 Meters Varsity | 13 | 18:06.09 | 1904 | 1903 |
2023-10-10 | Northeast Iowa Conference Championships | Mens 5,000 Meters Varsity | 22 | 18:49.29 | 1882 | 1887 |
2023-10-19 | Iowa State Qualifier - 2A - Monticello | Mens 5,000 Meters Varsity | 25 | 18:04.90 | 1930 | 1911 |
2024-09-03 | 2024 Oelwein Invitational | Boys Varsity 5K | 84 | 20:37.20 | 1726 | 1731 |
2024-09-10 | Dick Pollitt Classic (Waverly-Shell Rock) | Boys 11th/12th 5K | 35 | 19:19.59 | 1857 | 1813 |
2024-09-17 | Osage Invitational | Boys Varsity 5000M | 16 | 19:09.70 | 1967 | 1897 |
2024-09-24 | Waukon Invitational | Varsity Boys 5K | 22 | 19:08.5 | 1920 | 1912 |
2024-10-05 | Crestwood Invitational | Boys Varsity 5000M | 8 | 20:20.20 | 1896 | 1902 |
2024-10-10 | New Hampton Invitational | Boys Varsity 5000M | 15 | 18:49.90 | 1904 | 1903 |
2024-10-15 | Northeast Iowa Conference | High School Boys | 39 | 19:23.93 | 1828 | 1872 |
2024-10-24 | 2024 Iowa Class 2A State Qualifier - Oelwein | HS Boys 5K | 28 | 18:44 | 1947 | 1912 |
Explore the visual trends of performance scores and updated ratings across different events. This graphical representation helps in understanding the progression and fluctuations in performance over time.
Ratings are dynamic estimates, representing a range of potential future performance outcomes. The box plots above illustrate these ranges, with the red dotted line indicating the "Performance Score" and the solid blue line showing the "Updated Rating". A performance score falling outside the expected range can lead to significant adjustments in the updated rating, reflecting the dynamic nature of performance evaluation.