Eric Francisco Pedro's Race Results

Below you'll find a detailed table of race results. The "Performance Score" reflects the rating for that specific race, while the "Updated Rating" represents your cumulative rating, influenced by past performances. This distinction is key, as your overall rating is a weighted average that slowly responds to your most recent race's performance score. For a visual representation of how these ratings evolve, refer to the graph below.

Event Date Event Name Race Name Finishing Place Finishing Time Performance Score Updated Rating
2023-08-28 Woodward Granger Invitational 5th Annual Woodward-Granger XC Boys 5 km 29 25:41.20 1598 1596
2023-08-31 WAYNE CC INVITATIONAL Boys 5k Run CC HIGH SCHOOL 88 23:58.57 1443 1508
2023-09-07 COLFAX-MINGO TIGERHAWK CC INVITE Boys 5k Run CC HIGH SCHOOL 59 22:13.05 1562 1547
2023-09-09 CENTRAL DECATUR CROSS COUNTRY INVITATIONAL 2023 Boys 5000 Meter Run Finals 19 21:55 1534 1541
2023-09-11 PLEASANTVILLE TROJAN INVITATIONAL Boys 5k Run CC High School 74 20:58.90 1548 1544
2023-09-21 ACGC CC Invite Boys 5k Run High School 64 23:47.79 1507 1525
2023-09-26 Clarke CC Invitational Boys 5k Run High School 62 23:33.5 1502 1514
2023-09-28 Chariton Invitational XC Chariton Invitational XC Boys 5 km 75 22:11.29 1500 1509
2023-10-12 Mount Ayr CC Invite Boys 5k Run High School 105 23:41.76 1398 1449
2024-09-03 2024 Woodward-Granger CC 6th Woodward-Granger xc meet - Boys 27 21:28.29 1744 1738
2024-09-05 Wayne CC Invite Boys 5k High School 38 20:16.90 1735 1737
2024-09-10 Central Decatur Invite Boys 5k 22 21:29.75 1649 1699
2024-09-12 Colfax-Mingo CC Invite Boys 5k High School 32 20:25.79 1740 1717
2024-09-16 Pleasantville CC Invite Boys 5k HIGH SCHOOL 48 20:41.70 1686 1703
2024-09-19 I-35 CC Invite Boys 5k HIGH SCHOOL 12 21:57.68 1731 1714

Performance Trends Over Time

Explore the visual trends of performance scores and updated ratings across different events. This graphical representation helps in understanding the progression and fluctuations in performance over time.

Ratings are dynamic estimates, representing a range of potential future performance outcomes. The box plots above illustrate these ranges, with the red dotted line indicating the "Performance Score" and the solid blue line showing the "Updated Rating". A performance score falling outside the expected range can lead to significant adjustments in the updated rating, reflecting the dynamic nature of performance evaluation.